    Gantt chart

    Gantt chart for a plan, with one bar per task from its start to its end on a time axis.

    Use a Gantt chart to show when each task of a plan runs and where tasks overlap.

    The build overlaps the design and the launch lands on 1 July

    Planned tasks by phase, illustrative dates

    PlanBuildShip

    duration is computed from the start and the end

    The same chart in each style

    Source

    Rich Markdown
    ```chart
    type: gantt
    title: The build overlaps the design and the launch lands on 1 July
    subtitle: Planned tasks by phase, illustrative dates
    data:
      inline:
        - {task: Research, phase: Plan, start: 2026-01-05, end: 2026-02-13}
        - {task: Wireframes, phase: Plan, start: 2026-02-02, end: 2026-03-06}
        - {task: Prototype, phase: Build, start: 2026-03-02, end: 2026-04-10}
        - {task: Build API, phase: Build, start: 2026-03-16, end: 2026-05-29}
        - {task: Build app, phase: Build, start: 2026-04-13, end: 2026-06-19}
        - {task: Docs, phase: Ship, start: 2026-05-18, end: 2026-06-12}
        - {task: Testing, phase: Ship, start: 2026-06-01, end: 2026-06-26}
        - {task: Launch, phase: Ship, start: 2026-07-01, end: 2026-07-01}
    encoding: {label: task, start: start, end: end, color: phase}
    ```
    

    Fields that matter

    • type: gantt with encoding.label for the task, encoding.start and encoding.end for its bounds, and optional encoding.color for a group such as a phase
    • Starts and ends are ISO dates or numbers, and both must be the same kind; the time axis follows the data
    • Tasks keep the order of the source, from top to bottom; RichView does not sort them or move them
    • A task that starts and ends at the same instant is a milestone, drawn as a diamond; a task that ends before it starts is an error
    • A row without a label, a start or an end is left out and reported
    • A panel takes at most 60 tasks; above that the chart is not drawn and check raises chart.limit-exceeded naming the limit and the count
    • The duration in a readout is computed by RichView and marked as derived
    • encoding.facet makes one Gantt chart per value on a shared time axis; axes.x.label titles the time axis

    Interactions

    • Hover or focus a bar to read the task, its start, end and duration.
    • Click a legend entry to remove a group of tasks and back.
    • Zoom the time axis to look at part of the plan.
    • Open the Table view, Download PNG or CSV, or Expand the chart.